Reconstruction of the State Committee for Motor Roads Administrative Building
Tashkent · Client: SUE Yangiyo'lqurilish
Full construction scope: roofing, external and internal works, HVAC, electrical installation.

Civil Construction · Since 2009
ARTVALOL TRAST delivers the full civil construction cycle for government and corporate facilities — from groundwork to commissioning, with acceptance certificates and no enforcement notices.
Scope of Works
ARTVALOL TRAST covers the complete construction cycle under a single general contract — without splitting the scope between multiple organisations.
Geodetic setting-out, earthworks, monolithic and pile foundations, below-grade waterproofing, incoming utility lines.
Columns, beams, floor slabs and staircases. Concrete strength and geometry controlled under ISO 9001:2015.
Brickwork, aerated concrete and sandwich blocks, curtain ventilated façades, glazing, granite and aluminium composite panel cladding.
Flat and pitched roofing: membrane waterproofing, thermal insulation, parapets, drainage systems.
Plastering, floor coverings, suspended ceilings, joinery and painting, door and window installation.
Electrical installation and lighting, heating and air conditioning, water supply and drainage, ventilation, low-voltage systems.
A selection from ARTVALOL TRAST's open registry of 50 projects.
Tashkent · Client: SUE Yangiyo'lqurilish
Full construction scope: roofing, external and internal works, HVAC, electrical installation.
Syrdarya Region · Client: SIRDARIYO MEGA LUX MCHJ QK
Foundation works, fabrication and supply of metal structures, turnkey construction.
Tashkent · Client: XALQ BANK
Demolition, electrical installation, general construction, external heat and water networks, alarm, LAN, landscaping.
Samarkand · Client: Aloqabank
Turnkey construction of the two-storey building.
Compliance
Civil construction in the Republic of Uzbekistan on high-responsibility facilities — ministries, banks, scientific institutions — is subject to continuous oversight by the State Architecture and Construction Inspectorate. Every stage is documented in as-built records and confirmed by concealed-works inspection certificates.
ARTVALOL TRAST has operated in this environment since 2009. During this period, the company has not received a single enforcement notice on facilities accepted by a government client.
Design documentation approval, building permit procurement, and facility handover are part of ARTVALOL TRAST's general contract scope, not a separate task for the client.
We will prepare a commercial proposal broken down by work type and phase. For tender commissions — a complete qualification document package.
Since 2009 · 50 projects on record · ISO 9001:2015