Reconstruction of the State Committee for Motor Roads Administrative Building
Tashkent · Client: SUE Yangiyo'lqurilish
The largest contract in the company's registry. Full general construction, roofing, HVAC.

Reconstruction & Capital Repair · Since 2009
ARTVALOL TRAST performs reconstruction of administrative buildings, research institutions, oil and gas facilities and banking infrastructure. Works are carried out in phases with site zoning and minimal impact on the client's operations.
Scope of Works
Every service area follows the regulatory framework of Uzbekistan, state-reviewed project documentation, and ISO 9001:2015.
Inspection of foundations, columns, slabs and walls with a defect report. Reinforcement using monolithic jackets and injection methods — without fully closing the building.
Heating, water supply, power, ventilation, low-current networks — with phased switchover avoiding prolonged facility shutdown.
Removal of worn roofing, rafter reinforcement, granite and aluminium panel cladding, restoration of architectural elements.
Rational floor plans while preserving load capacity. New floors and extensions per the calculated capacity of existing structures.
Reconstruction using materials approved by heritage protection authorities — including the grounds of the Amir Timur Mausoleum in Samarkand.
Instrumental inspection of structures and engineering systems. The defect report forms the basis of the design brief.
Structural solutions, material specifications, a phased work plan that accounts for the facility's operating schedule.
State review of project documentation, work permits, coordination with sanitary and fire supervision authorities.
The construction zone is separated from occupied areas. The institution continues normal operations.
Incoming material control, intermediate concealed-works inspection, acceptance act per the norms of the Republic of Uzbekistan.
Projects from the open registry with verified clients, years and work volumes.
Tashkent · Client: SUE Yangiyo'lqurilish
The largest contract in the company's registry. Full general construction, roofing, HVAC.
Mirzo-Ulugbek District, Tashkent · Client: Single Customer Service of the Academy of Sciences
General construction works at a facility of the Academy of Sciences of the Republic of Uzbekistan.
Tashkent · Client: Cabinet of Ministers of the Republic of Uzbekistan
Demolition, electrical installation, roofing, engineering networks, alarm, CCTV, landscaping.
Samarkand · Client: NAC Uzbekistan Airways
Reconstruction, landscaping, asphalting, fit-out of the Presidential Terminal — a high-security access facility.
Mirzo-Ulugbek District, Tashkent · Client: Aloqabank
External works, façade elements, interior finishing, CCTV, alarm, local network — delivered turnkey.
Working Conditions
Reconstruction of high-responsibility facilities requires an approach different from new construction: the building continues to operate, the client's staff works in adjacent offices, and site access is controlled by a security service.
Since 2009, ARTVALOL TRAST has carried out reconstruction under exactly these conditions. Site zoning, phased switchover of engineering systems, and coordination of each phase with the client's technical supervision are the company's standard operating mode.
As-built documentation is transferred to the client in full. The facility is handed over without any notices from state construction supervision authorities.
We will conduct a technical inspection and prepare a commercial proposal. We work across the entire territory of the Republic of Uzbekistan.
Since 2009 · 50 projects on record · handover without supervision notices